About the Project:
Sydney’s Luna Park was introducing some new rides at their iconic theme park. They were in the process of adding a larger roller coaster to the garden and required concrete piers to be drilled into the ground to support the weight of the new ride.
The Problem:
When the piers were drilled, the contractors drilled through an existing 225mm Storm Water Drain below, which collects all the stormwater to the premises. To prevent the cost and delays in excavation work, we were called out to reline the drain.
How We Fixed It:
With the use of our robotic cutter, we grinded away at the broken sections of the crushed pipe and removed any broken pieces of pipe in preparation for the relining process.